Hp ProLiant BL680c G5 Server-Blade Instrukcja Użytkownika Strona 34

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 33
Hardware options installation 34
5.
Install the mezzanine card. Press down above the connector to seat the board.
6. Install the access panel (on page 15).
7. Install the server blade ("Installing a server blade" on page 19).
8. Power up the server blade (on page 13).
Cache module and battery pack option
The optional BBWC enabler provides the system with a means for storing and saving data in the event of
an unexpected system shutdown.
To install the component:
1. Back up all data on the hard drive.
2. Power down the server blade (on page 13).
3. Remove the server blade (on page 14).
4. Remove the access panel (on page 14).
Przeglądanie stron 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 99 100

Komentarze do niniejszej Instrukcji

Brak uwag