Hp ProLiant DL385 G6 Server Instrukcja Użytkownika Strona 50

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 49
Hardware options installation 50
8.
Install the PCI riser cage (on page 23).
9. Install the access panel (on page 22).
Installing a full-length expansion board
1. Power down the server (on page 20).
2. Extend the server from the rack (on page 20).
3. Remove the access panel (on page 21).
4. Remove the PCI riser cage (on page 22).
5. Remove the expansion slot cover ("Removing expansion slot covers" on page 48).
6. Open the full-length expansion board retainer.
7. Install the expansion board.
8. Close the slot cover latch.
9. Close the full-length expansion board retainer.
Przeglądanie stron 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 105 106

Komentarze do niniejszej Instrukcji

Brak uwag