Hp A9834-9001B Instrukcja Użytkownika Strona 103

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 247
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 102
Chapter 3
Installing the System
Setting Up the System
103
Installing and Verifying the PDCA
All systems are delivered with the appropriate cable plug for options 6 and 7 (Figure 3-25 on page 104).
Check the voltages at the receptacle prior to plugging in the PDCA plug.
To verify the proper wiring for a 4-wire PDCA, use a DVM to measure the voltage at the receptacle.
Voltage should read 200 to 240V ac phase-to-phase as measured between the receptacle pins as follows:
L1 to L2, L2 to L3, L1 to L3 (Figure 3-26 on page 104).
To verify the proper wiring for a 5-wire PDCA, use a DVM to measure the voltage at the receptacle.
Voltage should read 200 to 240 V ac phase-to-neutral as measured between the receptacle pins as follows:
L1 to N, L2 to N, L3 to N (Figure 3-27 on page 105).
Przeglądanie stron 102
1 2 ... 98 99 100 101 102 103 104 105 106 107 108 ... 246 247

Komentarze do niniejszej Instrukcji

Brak uwag