HP Performance-Optimized Datacenter, 6 m (20 ft) Site Requirements Information Part Number 587017-002 March 2010 (Second Edition)
HP POD specifications 10 Top view Item Component 1 Heat exchanger access panels Water input side view Item Component 1 CWR/CWS portal 2 Ce
HP POD specifications 11 Double door end view Item Component 1 IT cable portals External cold aisle view Item Component 1 Fire suppression
HP POD specifications 12 External hot aisle view Callout Feature 1 Main input power A and B feeds 2 Controlled access keypad (optional) Inter
HP POD specifications 13 Control cabinet interior Item Component 1 Access control system components 2 Fire alarm/fire suppression system compon
HP POD specifications 14 Item Component 7 Fan sequencers 8 Fan power relays 9 Redundant power relays 10 EPO controls and indicators Water sup
Water quality requirements 15 Water quality requirements Water quality requirements and specifications • Closed-loop water must not contain any lim
Water quality requirements 16 Piping materials Do not use the following interconnecting piping materials in a closed water system: • Oxidizing bioc
Power management 17 Power management Connection requirements When determining the final location of your power and water connections, consider the d
Power management 18 Item Component 1 Main input power side B lugs and breakers, located behind dead front panels. 2 Main input power side A lugs a
Supported facility connections 19 Supported facility connections Humidifier specifications A dedicated supply of domestic water is required if the o
© Copyright 2009, 2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warr
Supported facility connections 20 Functional and supplementary grounding straps are provided between each rack and HP POD. IMPORTANT: Before ins
Supported facility connections 21 Fire, safety, and security notifications Dry contacts are provided to enable the connection between the fire alarm
Acronyms and abbreviations 22 Acronyms and abbreviations ASSD air sampling smoke detector BMS building management system ECS environmental control
Contents Site requirements ...
Site requirements 4 Site requirements About this document This document outlines the installation requirements for a 6 m (20 ft) HP POD. These guide
Site requirements 5 • You have chilled water at your final location. • You have made provisions for properly grounding the HP POD. System utiliti
Site requirements 6 Item Component 1 Main input power junction boxes 2 IT cable portals Drainage
Site requirements 7 Drain hot aisle view Item Component 1 Water main supply/return drains 2 Heat exchanger condensate drain Optional connecti
Site requirements 8 Features Specifications Nonoperating temperature* -29ºC to 54ºC (-20ºF to 130ºF) Operating humidity • 0% to 100% relative nonc
HP POD specifications 9 HP POD specifications Dimensions The HP POD is approximately 6.7 m (22 ft) long, 2.4 m (8 ft) wide, and 3.1 m (10 ft) tall.