Hp Insight Foundation Software for ProLiant Instrukcja Użytkownika Strona 17

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 16
3 Preparing hardware for migration
Verifying hardware and operating system support
Before you start any X2P (P2P or V2P) migration, verify the following:
The source server operating system is supported on the destination server. To verify OS support
on ProLiant destination servers, see the following website:
http://www.hp.com/go/ossupport
For the supported hardware and software configurations of server migration, see HP Insight
Management Support Matrix available at:
Enterprise Information Library
Remove unsupported storage and NIC controllers from the destination server before you perform
a migration. Unsupported storage and NIC controllers can be added back on the destination
server, with proper manual configuration, after a migration.
Verifying system requirements for the application station
The application station has the following prerequisites:
A supported Windows operating system running on physical hardware or as a Windows
guest on a supported hypervisor. For a list of supported operating systems, and CMS hardware
and software requirements and caveats, see HP Insight Management Support Matrix at the
following website:
Enterprise Information Library
Microsoft iSCSI Initiator, which you can download and install from http://www.microsoft.com
if it is not already available with the operating system on your application station.
Insight Control server migration installed on an NTFS partition.
Availability of ports 51124 and 51125 (or ports specified during Insight Control installation
for agent communications and HP Integrated Lights-Out (iLO) booting).
Availability of port 51127.
User account credentials with administrative rights.
Free disk space of at least 600 MB per iLO boot, while booting a destination server for P2P
and V2P.
The initial installation of Insight Control server migration can take 1 GB of storage space, and
each automatically booted destination server will need at least 600 MB of storage space on
the application station .
NOTE: Before running migration of Windows 2008 SP2 to Smart Array controllers, delete the
following files located in the IC Server Migration Installation base>\log folder:
dismlogs.txt.pkgmgr
dismlogs.txt.pkgmgr.dpx
dismlogs.txt.pkgmgr.perf
Verifying hardware and operating system support 17
Przeglądanie stron 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 86 87

Komentarze do niniejszej Instrukcji

Brak uwag