10. The wizard verifies the SAS configuration. All blades should be powered on during this step.
A warning appears if a controller cannot be accessed. Power up the blades and retry the
operation.
11. The wizard validates the storage RAID/volume layout.
12. When the Join a Cluster Step 2 dialog box appears, enter the requested information.
NOTE: Register IP is the Fusion Manager (management console) IP, not the IP you are
registering for this server.
13. The Network Configuration dialog box lists the configuration for bond0. If your cluster uses
the unified network, the configuration is correct. Select Continue.
14. The Configuration Summary dialog box lists the configuration of the blade. If the information
is correct, select Commit.
Installing the first expansion blade 101