Hp 6Gb SAS Switch for HP BladeSystem c-Class Instrukcja Użytkownika Strona 12

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 11
1. Remove the air baffle from the selected interconnect bay.
2. Prepare the switch.
3. Install the switch in the open interconnect bay.
When installed in an operational enclosure, the switch automatically powers up and performs
a series of Power On Self Tests before being operational.
NOTE: Do not connect cables to the switch at this time. HP recommends connecting cables
only after confirming that the switch is operational and has the desired, supported version of
firmware installed.
12 Installation procedures
Przeglądanie stron 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 38 39

Komentarze do niniejszej Instrukcji

Brak uwag