Hp 9000 Virtual Library System Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Przechowywanie Hp 9000 Virtual Library System. HP 9000 Virtual Library System User Manual [en] [es] Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - For VLS Firmware 6.1.0

HP 9200 Virtual Library System User GuideFor VLS Firmware 6.1.0AbstractThis document describes the HP VLS9200 systems to facilitate their installation

Strona 2

17 Documentation feedback...221A Troubleshooting...

Strona 3 - Contents

A secure shell or serial session provides the following:• Setting the VLS network settings• Configuration and management of VLS virtual devices (libra

Strona 4 - 4 Contents

VLS Critical Diagnostics ServicesVLS Critical Diagnostics Services is a mini HTTP service built into VLS to provide the status anddetails of the hardw

Strona 5 - Contents 5

After completion, the ticket is listed under Available Tickets; click Download to download theticket or Delete to delete it.• Start Web ConsoleEnter t

Strona 6 - 6 Contents

9 ConfigurationThis section describes how to configure and manage the VLS network settings, user preferences,Fibre Channel host ports (optional), virt

Strona 7 - Contents 7

Figure 8 VLS discovery utility — main window3. To visually identify a device listed, select the device from the list and click Beacon. This willillumi

Strona 8 - 8 Contents

2. To see the current configuration settings, at the prompt enter:showConfig3. Set each desired configuration value by entering:setConfigValue <-ta

Strona 9 - Contents 9

4. Current network configuration, NTP settings, and time zone settings are displayed. Modifythese as needed (Figure 9 (page 106)).Figure 9 Set Network

Strona 10 - 10 Contents

10. Enter the warranty serial number in the Warranty Serial Number dialog box. This is displayedon the Identity tab and is saved and restored as part

Strona 11 - Contents 11

Enabling and Disabling OversubscriptionTo enable oversubscription:In Command View VLS:1. Select the System tab.2. Select Chassis in the navigation tre

Strona 12 - 1 Introduction

Reclaiming Storage SpaceThe Reclaim Space task appears on the Chassis status screen when the storage capacity consumedreaches the user-defined thresho

Strona 13 - VLS9200 Components 13

French Notice...239German Notice...

Strona 14 - 2 Hardware Installation

Operating System LUN Requirements and RestrictionsMost operating systems require that each VLS Fibre Channel host port connected to the SAN hasa virtu

Strona 15 - Rack Requirements

Setting the Default LUN MappingYou can set a global default to disable or enable LUN mapping. The setting you choose will applyto every new host that

Strona 16 - Rack Warnings

5. Select a library from the Choose a Library list to view its mapped devices.The window refreshes to show the appropriate list.6. Use the View By lis

Strona 17 - VLS9200 Node Shipping Carton

NOTE: After you map or unmap the virtual devices, the VLS automatically reassigns a logicalunit number (LUN) to each virtual library and tape drive cr

Strona 18

Dual Port Virtual DevicesWhen creating a library robot LUN or tape drive LUNs, you can present the virtual devices to apair of host ports rather than

Strona 19 - VLS Assembly Overview

Figure 11 Create Virtual Library Wizard window (2 of 12)7. Change the library name if you prefer. You can use letters, numbers, and underscores (nobla

Strona 20 - Installing PDUs

Editing a Virtual LibraryTo edit the slots and drives of a virtual library, from Command View VLS:1. Click the System tab.2. Expand Chassis in the nav

Strona 21

8. Choose one of the following options:• To perform LUN mapping for the virtual tape drive, click Map LUNs and proceed to “LUNMapping” (page 110) for

Strona 22 - Installing Cage Nuts

NOTE: NetBackup has total barcode limit of eight characters. HP Data Protector has a totalbarcode limit of 16 characters. Check your user guide for ot

Strona 23

NOTE: You cannot destroy a library that is currently being accessed by a backup application.When a virtual library is destroyed, all the tape drives a

Strona 24 - 24 Hardware Installation

1 IntroductionThe HP Virtual Library System (VLS) family consists of RAID disk-based SAN backup devices thatemulate physical tape libraries, allowing

Strona 25

10 ManagementThis section details the VLS management procedures such as changing the account passwords,managing high availability, and saving configur

Strona 26 - 26 Hardware Installation

LUN Path FailoverLUN path failover allows the VLS to automatically reroute data traffic usually assigned to one(preferred) path to another (secondary)

Strona 27

When a failure occurs, repair the failure. In most cases, the system will automatically recognizethat the repair is complete and restore the path or p

Strona 28 - 28 Hardware Installation

• Reconstructing — The virtual disk is being reconstructed.• Verifying — The virtual disk is being verified.• VDisk Scrubbing — The virtual disk is be

Strona 29 - Cabling the Node

1. Navigate to the Manage Virtual Disks screen (see “Managing Disk Arrays” (page 122)).2. Select Update Firmware from the task bar.3. Select the disks

Strona 30 - 30 Hardware Installation

4. Click Submit.The screen displays a warning.5. Click Submit.The screen displays a confirmation that the mode was changed.For all existing arrays, th

Strona 31

4. Click the View button beside the group of cartridges you want to edit.If viewing by barcode, enter a cartridge range to view a specific cartridges

Strona 32 - Cabling External Connections

• Moving a target cartridge from its existing library to a different library or to the firesafe, or toa different slot that is not part of the echo co

Strona 33

1. On the Cartridge Details screen, select all the cartridges that you want to delete and erase.2. If you have installed a Secure Erasure license, sel

Strona 34 - 34 Hardware Installation

To add or delete a barcode template, from Command View VLS:1. Click the System tab.2. Select Cartridges in the navigation tree.3. Click Add/Remove Bar

Strona 35 - Cabling Ethernet Switches

VLS9200 system scalability considerations:• Two Fibre Channel ports (one Fibre Channel port on each Fibre Channel switch) are requiredfor each VLS nod

Strona 36 - 36 Hardware Installation

• After adding a virtual tape drive and the default LUN number assigned to it is not consecutivewith the other virtual tape drives in the same library

Strona 37

Saving Configuration SettingsNOTE: The VLS firmware ensures a persistent VLS serial number and Fibre Channel port WWPNs,so that in the event of any ha

Strona 38 - 38 Hardware Installation

11 MonitoringThis section describes the various tools you can use to monitor the status of the VLS hardware andvirtual devices (libraries and tape dri

Strona 39

Figure 14 Device status icon in the status bannerA device status icon can be one of four states:Unknown—A component's operating condition is unkn

Strona 40

A notification alert can be one of four states:Unknown—The operating condition of the component or component part is unknown. ContactHP Technical Supp

Strona 41

Edit the Email SettingsEmail notification is sent to the persons you include on the email distribution list in the email settings.You specify the emai

Strona 42 - 3 Multi-node Setup

6. To test an email address entry, click Test Email.If the test message is not received at the email address, check the email server settings.SNMP Not

Strona 43 - 4 Storage Configuration

6. Test the system using the new community strings to ensure your changes were applied.SMI-S SupportSMI-S support allows applications attached to the

Strona 44 - Removing VLS Capacity

The Capacity Manager screens are designed to provide quick information for monitoring anddiagnostic purposes. The overall data reduction (compression

Strona 45 - Rebuilding all Storage Pools

Table 15 System Capacity TableTotal physical storage capacity purchased and installedon the system. This is the sum of all LUN capacity in thepool, mi

Strona 46 - 46 Storage Configuration

2 Hardware InstallationThis section details the steps to install the VLS hardware from installation preparation to final cabling.Preparing for the Ins

Strona 47

Table 16 Storage Pool Capacity Table (continued)The space required for system overhead and metadata.Storage Pool 1 or the FireSafe can have more space

Strona 48 - Notifications tab

Table 17 Storage Pool Capacity Table (continued)reserved than other storage pools due to Deduplicationmetadata that can be up to 2 TB.The physical sto

Strona 49 - 5 Automigration/Replication

Figure 21 Library Capacity ScreenThe Library Capacity table lists the following capacity values:Table 19 Library Capacity TableTotal storage capacity

Strona 50 - Replication Concepts

• On the information screen, click the Barcode name field link.The Cartridge Capacity screen displays capacity information for this cartridge and a gr

Strona 51 - Tape Initialization

The Libraries screen displays the list of libraries and FireSafe capacity utilization in your VLS.Figure 23 Libraries ScreenThe Libraries Capacity tab

Strona 52 - Managing a SAN Library

Table 24 Cartridges Capacity TableThe barcode of the cartridges in the library. The barcodename is a link to display the capacity information aboutthe

Strona 53

3. Using the >> button, move the devices of interest into the Selected Devices box. These are thedevices that will display in the report. You ca

Strona 54 - Echo Copy Pool Operations

Show the performance of:• All Nodes• Pre-defined ViewsSelect one of the views from the list. You can create these views on the Configuration tab.• Mos

Strona 55 - Creating an Echo Copy Pool

DataItemTime stamp8Ignore this field9SAN HealthThe SAN Health tab displays information on the number and types of errors encountered on theSAN. See (p

Strona 56 - 56 Automigration/Replication

Figure 26 SAN Health tabLogical CapacityThis tab displays different views of the current logical capacity usage for an individual library orthe entire

Strona 57 - Creating Virtual Tapes

UnpackingPlace the shipping carton as close to the installation site as possible. Before unpacking the VLS,inspect the shipping carton for damage that

Strona 58 - 58 Automigration/Replication

you show four days of data the graphs show one data point for every four-hour period. Usethe Advanced Setting list to indicate which data point out of

Strona 59 - Echo Copy Pool Operations 59

Using the Workload Assessment TemplatesDeleting a workload assessment template:1. Select the template from the template summary screen.2. Select Delet

Strona 60 - Restarting a Broken Mirror

3. Select Update Graphs. The graphs update to reflect the data options you chose.Deduplication Job HistoryThis tab displays the count of both active a

Strona 61 - Editing Copy Pools

ISV~<virtual cartridge barcode>~<virtual library serial number>~<virtual library slotnumber>See the HP VLS Solutions Guide for impor

Strona 62 - 62 Automigration/Replication

• Number of Concurrent Jobs — the number of read or write operations (called streams)running at the same time. The larger the number, the more the sto

Strona 63 - Editing Copy Pools 63

3. If you want to choose which nodes will be tested, follow the steps below. Otherwise, allavailable nodes are selected by default.a. Click the Select

Strona 64 - Deleting a Copy Pool

2. Select the Background Job tab.This tab displays information for all previous and current Background jobs. The Storage Pool,Number of Concurrent Job

Strona 65

The log monitor table displays:• Time — the date and time the decompression error was logged in the system log.• SDev Number — the Set Device number l

Strona 66

• Offset• Length• UUID• IP address• Enclosure number• Range of suggested disk numbers within the enclosure• Part number of the faulty driveJobs are on

Strona 67 - Tape Drive Details

4. On the task bar, select Clear Compression Faults.The screen refreshes and the correct status is displayed. (If the status does not change, it wasal

Strona 68 - Forcing a Replication Job

Rack WarningsWARNING! To reduce the risk of personal injury or damage to the equipment, before installingequipment be sure that:• The leveling jacks a

Strona 69

7. Right-click Download.8. Select Save Target As.The name of a zip file is displayed in the File name box. Do not change the generated filename.9. Cli

Strona 70 - Editing the Management URL

12 CLI Command SetThis section describes the VLS command-line interface (CLI) command set. The CLI command allowsyou to remotely configure, manage, an

Strona 71

Output CommandsUse the CLI commands in CLI output commands to control the output and display help informationfor the CLI commands.Table 26 CLI Output

Strona 72 - Replacing a Library

Table 27 CLI Network Settings Configuration Commands (continued)DescriptionCommandDisplays the day, date, time, time zone, and year (such as Mon March

Strona 73 - Stopping a Tape Export

Table 28 CLI Configuration Commands (continued)Usage1CommandReturns whether the oversubscription feature is enabled or disabled and the capacityremain

Strona 74 - 74 Automigration/Replication

Table 28 CLI Configuration Commands (continued)Usage1Command-p <s> - Product (DLT7000, SDLT320, ...) (required)-pm <n> - FC port to which

Strona 75

Table 28 CLI Configuration Commands (continued)Usage1CommandReturns a list of available cartridge emulation types. Displays each cartridge emulation&a

Strona 76 - 76 Automigration/Replication

Table 28 CLI Configuration Commands (continued)Usage1CommandDeletes the specified cartridge and its user data from the VLS. Where the options are:-a &

Strona 77

Table 28 CLI Configuration Commands (continued)Usage1CommandLists the current host access mode for all enabled hosts in the system.listAccessModeSets

Strona 78 - Status of all Cartridges

Table 29 CLI Management Commands (continued)Usage1Command-y <n> - Cartridge emulation type (2, 3, ...) (required)-h - Displays command usage inf

Strona 79

DescriptionItemLTU (1 for 10 TB, 2 for 20 TB)6Printed VLS array installation poster (1)7Ethernet cables (2) and FC cables (2), not shown (shipped sepa

Strona 80 - Cartridge Details

Table 30 CLI Monitoring Commands (continued)Usage1CommandReturns all the notification alert messages that occurred starting with the specified date.Wh

Strona 81 - Viewing the Job History

Table 30 CLI Monitoring Commands (continued)Usage1Command-h - Displays command usage information (optional)Returns the SNMP management console configu

Strona 82 - Configuring the GUI Displays

13 Component IdentificationThis section provides illustrations and descriptions of the node, disk array enclosure, Fibre Channel(FC) switch, and Ether

Strona 83 - Testing the VLS Connectivity

StatusDescriptionItemOff = Identification is deactivated.Green = System health is normal.Health LED2Amber = System health is degraded. To identify the

Strona 84 - 6 Deduplication

1(PCIe2 = Gen2 signaling rate, x8 = physical connector link width, (8, 4, 2, 1) = negotiable link widths)Rear Panel LEDs and ButtonsStatusDescriptionI

Strona 85 - ◦ Large (greater than 14 TB)

System Board ComponentsDescriptionItemNMI jumper1System maintenance switch210 Gb sideband connector3SATA DVD-ROM drive connector4SAS cache module conn

Strona 86 - Deduplication Summary

DescriptionItemPCI power connector24TPM connector25PCIe riser board connectors (2)26Accessing the HP Systems Insight DisplayTo eject the HP Systems In

Strona 87 - Deduplication Backup Report

StatusDescriptionItemTo determine Power cap status, see HP SystemsInsight Display LEDs and Internal Health LEDCombinations.Power cap LED1Green = Netwo

Strona 88 - GB follows the same logic

StatusSystem powerLEDInternal health LEDcolorHP SystemsInsight DisplayLED and color• Processor X is unsupported.• ROM detects a failed processor durin

Strona 89 - 7 Operation

Hard Drive LEDsDescriptionItemFault/UID LED (amber/blue)1Online LED (green)2Hard Drive LED CombinationsInterpretationFault/UID LED(amber/blue)Online/a

Strona 90

DescriptionItem8 Gb FC transceivers (2)4Power cords (2)5Quick Restore CD (1)6Printed VLS node installation poster (1)7Ethernet cables (2) and Fibre Ch

Strona 91

Front Panel ComponentsDescriptionItemQuick release levers (2)1Systems Insight Display2Hard drives3DVD-ROM drive4Video connector5USB connectors (2)6Fro

Strona 92 - Powering On the VLS System

StatusDescriptionItemRed = System health is critical. To identify thecomponent in a critical state, see HP Systems InsightDisplay LEDs and Internal He

Strona 93 - Rebooting the VLS System

DescriptionItemNIC 3 connector17NIC 4 connector18Rear Panel LEDs and ButtonsStatusDescriptionItemGreen = NormalPower supply LED1Off = System is off or

Strona 94 - Powering Off VLS Arrays

DescriptionItemEthernet port1Serial port2Fibre Channel ports3XPAK transponder ports (not in use)4Front Panel LEDs and ButtonsThis section provides ima

Strona 95 - Powering Off VLS Arrays 95

StatusDescriptionItemMaintenance button4• To reset the switch — press and hold the Maintenance button for less than twoseconds. This action clears any

Strona 96 - 8 User Interfaces

Front Panel LEDs and ButtonsStatusDescriptionItemWhen pressed with the Reset button in a specific pattern, any configuration changesyou may have made

Strona 97 - Window Regions

StatusDescriptionItemOff = One of these conditions exists:• No active network cable is connected to the port• The port is not receiving link beat or s

Strona 98 - 98 User Interfaces

Front Panel LEDs and ButtonsStatusDescriptionItemGreen = The switch is operating correctly.Power LED1Off = The switch is not operating correctly or is

Strona 99 - Restarting Command View VLS

StatusDescriptionItemMode select button:Port LED Mode selectbutton and indicatorLED4Press the button to step from one mode to the next. The current mo

Strona 100 - Closing a Serial Session

StatusDescriptionItemMode:The operation of the Mode LED is controlled by the LED Mode select button, andthe current setting is indicated by the LED Mo

Strona 101

VLS9000 40-port Connectivity Kit Shipping CartonDescriptionItemEthernet switches (2)120–port FC switches (2)21U rack mount kits (4) and documentation3

Strona 102 - 102 User Interfaces

Front Panel LEDsStatusDescriptionItemA hex LED shows the enclosure ID, which enables you to correlate an enclosurewith logical views presented by Comm

Strona 103 - 9 Configuration

Rear Panel ComponentsBase EnclosureDescriptionItemPower module 01RAID controller 02RAID controller 13Fibre Channel port 04Fibre Channel port 1 (not us

Strona 104 - 104 Configuration

DescriptionItemSAS port 1, output port6Power module 17Rear Panel LEDs and ButtonsBase EnclosureStatusDescriptionItemToggle, where O is Off.Power switc

Strona 105

StatusDescriptionItemBlinking green = At least one FC port has I/O activity.Fibre Channel portactivity LED11Off = The FC ports have no I/O activity.Gr

Strona 106 - Setting the User Preferences

1Some power supply models do not have a power switch. In this case, power down the enclosure by unplugging thepower cords from the enclosure.194 Compo

Strona 107 - Managing Oversubscription

14 Component ReplacementThis section provides detailed instructions for replacing customer-replaceable VLS components. SeeCustomer Self Repair for det

Strona 108 - Shutdown at 98% Capacity

Warnings and CautionsBefore removing the node access panel, be sure that you understand the following warnings andcautions.WARNING! To reduce the risk

Strona 109 - Managing Virtual Device LUNs

Removing a VLS Node from the RackTo remove the node from a rack:1. Power off the node. See Powering Off the System.2. Disconnect the cabling.3. Extend

Strona 110 - LUN Mapping

2. Pull the hard drive (3) out of the node by the latch handle (2).Figure 27 Removing a Node Hard DriveTo replace the component, pull out the latch ha

Strona 111 - Mapping LUNs by Device

DVD-CD DriveCAUTION: To prevent improper cooling and thermal damage, do not operate the node unlessall bays are populated with either a component or a

Strona 112 - Mapping LUNs by Host

© Copyright 2011, 2012 Hewlett-Packard Development Company, L.P.The information contained herein is subject to change without notice. The only warrant

Strona 113 - Setting Up the Hosts

1. Install base and capacity disk array enclosures using HP 9200 Virtual Library System 10 TBand 20 TB SAS Base Enclosure Installation Instructions an

Strona 114 - Creating a Virtual Library

2. Press the power supply release lever (1), and then pull the power supply from the node.To replace the component:WARNING! To reduce the risk of elec

Strona 115

Fan ModuleCAUTION: Do not operate the node for long periods without the access panel. Operating thenode without the access panel results in improper a

Strona 116 - Creating Tape Drives

5. To remove fan module 2 or 3:a. Remove the power supply air baffle.b. Remove fan module 2 or 3.To replace the component, reverse the removal procedu

Strona 117 - Creating Cartridges

NOTE: FBDIMMs do not seat fully if turned the wrong way.When replacing a FBDIMM, align the FBDIMM with the slot and insert the FBDIMM firmly (1),press

Strona 118 - Destroying a Virtual Library

a. On the primary node, connect to the serial port or use the keyboard and mouse ports toconnect to a console.b. Power on the primary node.After sever

Strona 119 - Destroying a Tape Drive

4. Disconnect all power cords from the node.5. From the back of the node, make a note of all cable connections then disconnect the cables.6. Remove th

Strona 120 - 10 Management

12. Power on the new switch.Fibre Channel Transceiver ReplacementTo replace a Fibre Channel transceiver1. Power off the system. See Powering Off the S

Strona 121 - Private LAN Dual Pathing

2. Pull the drive out of the disk array by its latch handle about 3 cm (1 inch) so that it isdisconnected from the backplane connector.CAUTION: A driv

Strona 122 - Managing Disk Arrays

4. Rotate the latch downward to about 45 degrees, supplying leverage to disconnect the powermodule from the internal connector.5. Use the latch to pul

Strona 123 - Updating the Disk Firmware

IMPORTANT: RAID controllers should only be replaced while the array is powered up to ensurethat the array will copy configuration data from the surviv

Strona 124 - Setting the RAID Mode

1. Determine the number of PDUs to install.• The number of PDUs you install is based on the number of arrays to install.• Install up to four arrays in

Strona 125 - Managing Cartridges

7. Press the latches upward until they are flush with the top edge of the controller, then turn thethumbscrew on each latch clockwise until they are f

Strona 126 - Moving Cartridges

15 Disaster RecoveryThis section details the VLS disaster recovery procedures. It includes recovering from operatingsystem failures, disk array failur

Strona 127 - Deleting Cartridges

Manually Restoring the SystemAfter re-installing the operating system, the warm failover feature restores the licenses andconfiguration settings. Howe

Strona 128 - 128 Management

8. Click Next Step. A message displays indicating that the file was uploaded successfully.9. Click Next to start loading the configuration file.After

Strona 129 - Freeing up Storage Space

3. Install the operating system on the new hard drives and restore the VLS. See Recovering fromOperating System Failure.Recovering from a Primary Node

Strona 130 - Updating the Firmware

4. Record the backend Fibre Channel WWPN from the console and configure them for theautomigration tape libraries.The Fibre Channel host port WWPNs on

Strona 131 - Saving Configuration Settings

• Cartridges configured• Automigration configuration• Host LUN mapping configuration7. Power up all secondary nodes. The boot up can take 10 to 20 min

Strona 132 - 11 Monitoring

16 Support and Other ResourcesRelated InformationDocumentsHP provides the following documentation to support this product:• HP Virtual Library System

Strona 133 - Notification Alerts

Table 31 Document Conventions (continued)ElementConventionMonospace text• File and directory names• System output• Code• Commands, their arguments, a

Strona 134 - E-mail Notification

Rack StabilityRack stability protects personnel and equipment.WARNING! To reduce the risk of personal injury or damage to equipment:• Extend leveling

Strona 135 - Edit the Email Settings

Figure 1 PDU and PDM locationsInstalling the Disk Array Enclosures into a RackThis section describes how to install the disk array enclosures into a r

Strona 136 - SNMP Notification

After subscribing, locate your products by selecting Business support and then Storage underProduct Category.Customer Self RepairHP customer self repa

Strona 137 - Monitoring Storage Capacity

17 Documentation feedbackHP is committed to providing documentation that meets your needs. To help us improve thedocumentation, send any errors, sugge

Strona 138 - Capacity Usage Views

A TroubleshootingThis appendix lists iLO troubleshooting features, and also describes some common issues you mayencounter while configuring or using t

Strona 139 - Storage Pool View

SolutionPossible causesSymptomvirtual devices the host can see, suchthat the virtual device LUN numbersinclude a LUN0 and no gaps in theLUN numbering.

Strona 140

SolutionPossible causesSymptomThis is normal and will not causeproblems.Real autoloader libraries do notsupport barcodes.Netbackup does not display th

Strona 141

SolutionPossible causesSymptom4. Check Increase performanceby disabling support forMicrosoft Backup Utility.5. Repeat this procedure for eachserver vi

Strona 142

Deduplication IssuesSolutionPossible causesSymptomConsider using cartridges that aresmaller than the sum of your dailyThe VLS does not free up storage

Strona 143 - Libraries View

B SpecificationsThis section provides the basic VLS node, Fibre Channel switch, Ethernet switch, and disk arrayenclosures specifications.For a complet

Strona 144 - Cartridges View

ValueSpecification2Number of processorsIntel® Xeon® 5600 seriesProcessors supported8 MB L3CacheDDR3 RDIMMMemory typeDDR3Standard memory192 GBMaximum m

Strona 145 - Exporting CSV Data

SpecificationItemPort types• 8 Gbps: FL_Port, F_Port, and E_Port; G_Port, GL_port (auto-configuring),Transparent Router (TR)• 10/20 Gbps: E_Port and F

Strona 146 - Current Status

7. On the rear vertical posts, starting at the same rack positions as in the front, install a cage nutin the middle hole of each position for each 2U

Strona 147 - Performance History

SpecificationItemTemperature• Operating: 41° to 104° F (5° to 40° C)• Non-operating: 4° to 158° F (20° to 70° C)Humidity• Operating: 10% to 90% non-co

Strona 148 - SAN Health

Ethernet Switch 6600–24GSpecificationItem21.5 x 17.4 x 1.7 in. (54.61 x 44.2 x 4.32 cm) 1U heightDimensions17.2 lb (7.8 kg) fully loadedWeight20 auto-

Strona 149 - Logical Capacity

C Regulatory Compliance NoticesThis section contains regulatory notices for the HP VLS9200 Virtual Library System components.Regulatory Compliance Ide

Strona 150 - Workload Assessment

off and on, the user is encouraged to try to correct the interference by one or more of the followingmeasures:• Reorient or relocate the receiving ant

Strona 151 - Replication History

Japanese NoticesJapanese VCCI-A NoticeJapanese VCCI-B NoticeJapanese Power Cord StatementKorean NoticesClass A EquipmentClass B EquipmentTaiwanese Not

Strona 152 - Receiving Automated Reports

“Please recycle waste batteries”Four-in-one recyclingsymbolTaiwanese Notices 235

Strona 153

Laser Compliance NoticesEnglish Laser NoticeThis device may contain a laser that is classified as a Class 1 Laser Product in accordance withU.S. FDA r

Strona 154

German Laser NoticeItalian Laser NoticeJapanese Laser NoticeLaser Compliance Notices 237

Strona 155

Spanish Laser NoticeRecycling NoticesEnglish NoticeBulgarian NoticeCzech Notice238 Regulatory Compliance Notices

Strona 156 - Log Monitor Summary

Danish NoticeDutch NoticeEstonian NoticeFinnish NoticeFrench NoticeRecycling Notices 239

Strona 157 - Log File Fields

1. Locate the front and rear rail pieces and screws from the rack mounting hardware kit contents.NOTE: The front rail piece has three long, beveled sl

Strona 158 - Clearing All System Faults

German NoticeGreek NoticeHungarian NoticeItalian NoticeLatvian Notice240 Regulatory Compliance Notices

Strona 159 - Trace Log Files

Lithuanian NoticePolish NoticePortuguese NoticeRomanian NoticeSlovak NoticeRecycling Notices 241

Strona 160 - 160 Monitoring

Spanish NoticeSwedish NoticeTurkish NoticeTürkiye Cumhuriyeti: EEE Yönetmeliğine UygundurBattery Replacement NoticesDutch Battery Notice242 Regulatory

Strona 161 - 12 CLI Command Set

French Battery NoticeGerman Battery NoticeBattery Replacement Notices 243

Strona 162 - VLS Commands

Italian Battery NoticeJapanese Battery Notice244 Regulatory Compliance Notices

Strona 163 - Configuration Commands

Spanish Battery NoticeBattery Replacement Notices 245

Strona 164

GlossaryThis glossary defines terms used in this guide or related to this product and is not acomprehensive glossary of computer terms.AAcceleratedded

Strona 165

deduplication The process of eliminating duplicate data from the backups on a virtual cartridge to reduce theamount of disk space required.disk array

Strona 166

Llibrary A storage device that handles multiple units of media and provides one or more drives for readingand writing them, such as a physical tape li

Strona 167

redundancy In a redundant system, if you lose part of the system, it can continue to operate. For example, ifyou have two power supplies with one that

Strona 168 - Management Commands

Mounting the Enclosures into the RackWARNING! The enclosure weighs 33.6 kg (74 lb) full. At least two people arerequired to lift, move, and install th

Strona 169 - Monitoring Commands

WWWNN World wide node name. A globally unique 64-bit identifier assigned to each Fibre Channel node.WWNN World wide node name. A globally unique 64-bi

Strona 170

IndexSymbols20–port Fibre Channel Switchspecifications, 22840–port connectivity kitshipping carton contents, 19Aaccelerated deduplication see deduplic

Strona 171

replicating outside policy windowsystems with deduplication, 74systems without deduplication, 68summary, 79unloading, 128viewing details, 125, 166view

Strona 172 - 13 Component Identification

see also SAN destination library or LAN/WANdestination libraryconnecting, 52import/export details, 67managing, 52status, 64status of all, 64unmanaging

Strona 173 - Rear Panel Components

Fibre Channel transceiverreplacing, 206firesafe, 119automigration, 61firmware, updating, 130Forced Non Deduplicated Copy, 74fully qualified name, sett

Strona 174 - Rear Panel LEDs and Buttons

iLO 3 Advanced, 46installing, 46re-installing, 212replication, 46Secure Erasure, 46load balancing, 120Load Blank Mediaecho copy pool, 59Load Media for

Strona 175 - System Board Components

installing, 20Pending, 79performance history report, 147performance repports, 145physical capacity report, 150, 151policy see library policyecho copy

Strona 176 - 176 Component Identification

opening, 100Send notification if cartridge not migrated in, 56Send notification if cartridge not replicated in, 57serial numberVLS, 131warranty, 107se

Strona 177

Non Deduplicated Copy, 74Rebuild All Storage Pools, 45Rebuild Storage Pool, 46Reclaim Space, 109Restart Emulations in Maintenance Mode, 45Run Pool Pol

Strona 178

4. Tighten all four screws.5. Repeat this procedure to install up to two more capacity enclosure above the previous one.6. At the top of the capacity

Strona 179 - Hard Drive LED Combinations

Table 1 Cabling the Base EnclosureConnects toDescriptionItemArray 1 base enclosure: connects to port 9 of Fibre Channel switch #1 (FC SW1)via FC cable

Strona 180 - Front Panel LEDs and Buttons

Installing the VLS Node into a RackNOTE: If you are installing the node into a telco rack, order the appropriate option kit at theRackSolutions.com we

Strona 181

Cabling the NodeTable 3 Cabling the NodeConnects toDescriptionItemPrimary node: connects to port 0 of Fibre Channel switch #2 in rack 1 (FC SW2)via FC

Strona 182

Contents1 Introduction...12VLS9200 Components...

Strona 183

Installing the VLS High Performance Node into a RackNOTE: If you are installing the node into a telco rack, order the appropriate option kit at theRac

Strona 184

Cabling the High Performance NodeTable 4 Cabling the NodeConnects toDescriptionItemPrimary node: connects to port 0 of Fibre Channel switch #2 in rack

Strona 185

IMPORTANT: Do not touch the Fibre Channel cable tips.Do not secure Fibre Channel cable with cable ties.Cabling External ConnectionsNOTE: Ethernet port

Strona 186

Installing Cage Nuts and Rail Flanges1. On the rack vertical posts, mark the holes (three on each front vertical post and two on eachrear vertical pos

Strona 187

Mounting Ethernet Switch 6600-24G into the Rack1. At rack position 39, from the back of the rack align the grooved ends of the switch rails withthe po

Strona 188

Cabling Ethernet SwitchesTable 5 Cabling Ethernet Switch #1 (SW1)Connects toDescriptionItemNIC 3 of primary node via Ethernet cablePort 11NIC 3 of sec

Strona 189

Table 8 Cabling Ethernet Switch #4, if present (SW2 of a second kit)Connects toDescriptionItemEthernet port of RAID Controller 1 of additional base ar

Strona 190 - Front Panel LEDs

1. If the metal mounting brackets are not attached to the switch, attach them as follows:a. Align the brackets so that the four screw holes are agains

Strona 191

Installing the Fibre Channel Switches into a RackInstalling the switches into the rack involves attaching rails to the Fibre Channel switches and then

Strona 192

5. From the front of the rack, secure the adjustable mounting flanges to the marked holes, usingscrews shipped with the rails.6. From the rear of the

Strona 193 - Capacity Enclosure

Removing VLS Capacity...44Configuring the Storage P

Strona 194 - 194 Component Identification

Cabling Fibre Channel SwitchesTable 10 Cabling Fibre Channel Switch #1 (FC SW1)Connects toDescriptionItemFC Port 3 of primary node via FC cablePort 00

Strona 195 - 14 Component Replacement

NOTE: Fibre Channel switch #1 is on the bottom and switch #2 is on the top. If present, FibreChannel switch #3 is on the bottom and switch #4 is on th

Strona 196 - Preparation Procedures

3 Multi-node SetupThis section explains how to configure the identities of each node after the nodes and othercomponents of the system are installed a

Strona 197 - Hard Drive

4 Storage ConfigurationThis section describes how to configure the storage pool policy and add or remove storage asneeded after the nodes have been co

Strona 198 - 198 Component Replacement

1. Install the capacity licenses. See “Installing Additional Licenses” (page 46).Each base and capacity enclosure comes with its own capacity licenses

Strona 199 - Power Supply

Configuring the Storage Pool PolicyVLS automatically creates storage pools on the VLS arrays in the system based on your storagepool policy. Storage p

Strona 200 - 200 Component Replacement

Rebuilding a Single Storage PoolTo delete all information on the VLS9200 arrays for one specific storage pool and reformat them,perform a Rebuild Stor

Strona 201 - Fan Module

The base license on the node enables the storage that is part of the base SKU. The capacitybundle includes the capacity license and the registration m

Strona 202 - 202 Component Replacement

NOTE: When installing deduplication or Secure Erasure licenses, the VLS system will automaticallyreboot. This may take a few minutes to begin; when it

Strona 203 - Replacing a Primary Node

5 Automigration/ReplicationInstead of the preferred method of copying virtual media to physical media via the backupapplication, another option is to

Strona 204 - Replacing a Secondary Node

Deploying SAN Destination Library or Tape Drive Firmware...71Generating a SAN Destination Library Su

Strona 205

• The destination library can only be used for copy operations.• Echo copy is a full tape copy, rather than an incremental change copy, so it can be a

Strona 206 - Ethernet Switch Replacement

Replication can be configured to operate in one of two modes:• Deduplication-enabled replication, known simply as replication — the virtual cartridge

Strona 207 - Power Module

Using automigration, you can share a single destination library across multiple virtual libraries(maximum of 20 drives on the physical libraries), or

Strona 208 - RAID or Expansion Controller

1. Select the Automigration/Replication tab.The Summary for All Managed Destination Libraries screen displays.2. Select Manage LAN/WAN Replication Lib

Strona 209 - Thumbscrews2

2. From the task bar, select Unmanage Library.The Unmanage Destination Library screen displays, showing all managed libraries. If thereare no managed

Strona 210 - 210 Component Replacement

of the mirror by using a Command View VLS Console and viewing the destination tapes inSlots in the expanded list under Destination Library.5. In order

Strona 211 - 15 Disaster Recovery

NOTE: The sizing factor is crucial to creating the right size virtual tapes. Whendetermining the sizing factor of the virtual tapes, keep in mind the

Strona 212 - Manually Restoring the System

LAN/WAN libraries:• Priority — the priority this echo copy pool takes over other copy pools during the backupwindow. This can be High, Medium, or Low.

Strona 213

NOTE: The tape is only created if a header exists and is legible by the system.Restoring from a SAN Physical CartridgeIf the destination tape is still

Strona 214 - 214 Disaster Recovery

Restoring from a LAN/WAN Virtual CartridgeFrom Command View VLS:1. Click the Automigration/Replication tab.2. Under Destination Libraries in the navig

Strona 215

Installing the SSL Certificate into your Web Browser...98Restarting Command View VLS...

Strona 216 - 216 Disaster Recovery

4. From the task bar, select Load Media for Overwrite to open the Load Media for Overwritescreen.5. From the drop-down box, select the copy pool you w

Strona 217 - Related Information

Viewing Automigration Cartridges in the FiresafeWhen a cartridge is ejected from the destination library, its matching virtual cartridge isautomatical

Strona 218

2. In the Copy Pool column, select any instance of the appropriate pool.The ECHO COPY POOL DETAILS screen displays.3. Select Delete in the taskbar.4.

Strona 219 - Subscription Service

4. On the Summary for Copy Pools screen, select the echo copy pool if interest to open the EchoCopy Pool Details screen for that copy pool.5. From the

Strona 220 - Product Warranties

Deleting a Copy PoolYou should delete a copy pool when you no longer need it. To delete a copy pool:1. Select Copy Pools under the appropriate library

Strona 221 - 17 Documentation feedback

the options are Connected, Configuration Out of Sync, and Unreachable. The screen alsoprovides the name and model of the library, number of simultaneo

Strona 222 - A Troubleshooting

DescriptionPool typeStatus messageGathering deduplication instructions needed for replication using tapetransport.Echo CopyExport Preprocessing*Copyin

Strona 223

DescriptionPool typeStatus messageTape in an Import pool slot that is in the catalog.Tape ImportReady For ImportActively copying data from the physica

Strona 224

Forcing a Replication JobThe Copy Now task allows you to schedule a replication (or automigration) job that forces thecartridge to replicate immediate

Strona 225

5. Hover over the Select Slot link for the first slot you want to edit. The screen displays a list ofthe available destination slots. Select a slot nu

Strona 226 - Deduplication Issues

Changing Cartridge Read and Write Access...126Moving Cartridges...

Strona 227 - B Specifications

Restarting Automigration/Replication ServicesIf you replace a tape drive on your physical tape library, you must restart automigration/replicationserv

Strona 228 - VLS9200 Disk Array Enclosure

4. Select Submit.The SUMMARY FOR ALL DESTINATION LIBRARIES screen refreshes, along with the message,“File [file name] successfully uploaded.”Deploying

Strona 229

2. From the task bar (in the Destination Library Details window), select Library Assessment Test.A dialog box displays to confirm the selection.3. Fro

Strona 230

LAN/WAN Destination Library OperationsThe following sections describe the destination library operations for LAN/WAN libraries availableto the user.Se

Strona 231 - Environmental

4. From the Echo Copy Pool Details screen, you can:• Select Initiate Tape Transport in the task bar to restart the export.• Select Cancel Tape Transpo

Strona 232 - FCC rating label

1. On the Automigration/Replication tab, select “Not migrated in Deduplication timeoutlimit/Forced Copies” from the Summary of All Cartridges screen.2

Strona 233 - European Union Notice

NOTE: If you selected your library from the navigation tree, this pull-down field does notappear because you have already selected the appropriate lib

Strona 234 - Taiwanese Notices

Summary for Cartridges screens. The state can be “unknown” when only the header transferredto the tape, when nothing transferred to the tape, during t

Strona 235 - Taiwanese Notices 235

5. Select OK from the dialog box.The LAN/WAN Replication Targets screen displays with the deleted target removed from thelist.Changing the LAN/WAN Rep

Strona 236 - Laser Compliance Notices

Cartridges in this category can also be listed in the following categories: Mirror Failed,Pending, Mirror Active, In Use/Deduplicating, and Waiting fo

Strona 237 - Japanese Laser Notice

Configuring the Storage Exerciser...153Storage Exerciser CLI Comman

Strona 238 - Recycling Notices

• Cancel Job — cancel one or more Mirror jobs. See (page 75).• Resume Job — resume one or more paused Mirror jobs. See (page 75).From the summary scre

Strona 239 - French Notice

• The node the job is running on• Status – active or pending• Expected completion time• The drive the job is running onChange the number of rows displ

Strona 240 - Latvian Notice

• Transfer rate• Source and target locations• The node the job is running on• Completion status• Compression (yes or no)The performance graph maps the

Strona 241 - Slovak Notice

2. In the navigation tree, expand Configuration Summary.3. Select GUI Configuration from the expanded list.4. In the Default Number of Rows in Slot/Ca

Strona 242 - Battery Replacement Notices

6 DeduplicationDeduplication is the functionality in which only a single copy of a data block is stored on a device.Duplicate information is removed,

Strona 243 - German Battery Notice

entire backup job and to prevent too many backup jobs from piling up on the same cartridge,but small enough that you are not wasting overall cartridge

Strona 244 - Japanese Battery Notice

NOTE: Once you change the algorithm from Backup to Enhanced Backup, you cannotrevert to Backup again. However, you can still disable the policy.• Enab

Strona 245 - Spanish Battery Notice

Deduplication Backup ReportThe backup report provides information on the deduplication of your backup jobs.1. Select Backup Report from the navigation

Strona 246 - Glossary

reclaimed that tape and therefore will not have saved any disk space. If the status is “PartiallyReclaimed” or “Dedupe Complete,” the backup disk spac

Strona 247

7 OperationThis section describes how to power on and power off the VLS nodes and arrays.Powering On VLS ArraysThe order in which you power up the dis

Strona 248 - 248 Glossary

Capacity Enclosure...191Rear Panel LEDs and Buttons

Strona 249

Figure 2 Base and Capacity Enclosure Front Panel LED Status – Normal OperationLED stateLEDLocationItemOff or blueStatus (blue or yellow)Hard drives1On

Strona 250 - 250 Glossary

Figure 4 VLS9200 Base Enclosure Rear Panel LED Status – Normal OperationLED stateLEDLocationItemOffVoltage/Fan Fault/Service Required (amber)Power mod

Strona 251

LED stateLEDLocationItemOnPower On/OK (green)5OnSAS Out port status (green)6Figure 6 VLS9200 Capacity Enclosure Rear Panel LED Status – Normal Operati

Strona 252 - 252 Index

Figure 7 VLS Node LED Status During Normal OperationStatusDescriptionItemLED is green.Internal health LED1LED is green.External health LED (power supp

Strona 253

Powering Off the SystemWARNING! To reduce the risk of personal injury, electric shock, or damage to theequipment, remove the power cord to remove powe

Strona 254 - 254 Index

NOTE: It is not necessary to power off a disk array enclosure when replacing a power module,hard drive, RAID controller, or expansion controller.To po

Strona 255

8 User InterfacesThis section describes the three user interfaces (UIs) that can be used to configure, manage, andmonitor the VLS over the web, remote

Strona 256 - 256 Index

• Installing VLS firmware updates• Saving and restoring VLS network settings and virtual library configurations• Restarting VLS device emulations and

Strona 257

NOTE: Entering “http://<fully qualified name>” instead of the above URLautomatically redirects you to the secure “https://<fully qualified na

Strona 258 - 258 Index

3. Select View certificates. A Certificate window opens.4. Select Install Certificate... to launch the Certificate Wizard.5. Select Next.6. Make sure

Komentarze do niniejszej Instrukcji

Brak uwag