HP Performance Optimized Datacenter 240e North America (Adiabatic) Site Preparation and Requirements Guide Abstract This guide is intended for the
Site requirements 10 CAUTION: If any racks contain empty RU space, use the HP POD 240e NA filler panels to maintain the efficiency of the HP POD 2
Site requirements 11 The following is a list of component requirements for grounding and bonding: • Grounding of the HP POD 240e NA must comply wit
Site requirements 12 Utilities Consider the proximity to required utilities, such as power, water, and network connections. While the required utili
Site requirements 13 • Do not use well water, industrial water, water from cooling circuits, or water contaminated by any chemicals or bacteria. •
Site requirements 14 IMPORTANT: To provide power to the HP POD 240e NA, external transformers and switchboards might be required. This equipment m
Site requirements 15 Transformers and switchboards The input power for the Critical IT Loads requires a source of 380-415V, 3phase wye power. If it
Supported facility connections 16 Supported facility connections Environmental control system The ECS developed for the HP EcoPOD is a stand-alone c
Supported facility connections 17 End view shown Connection portal diameter Connection point Quantity per IT section Total quantity per HP POD 24
Supported facility connections 18 IMPORTANT: The connection portal location and configuration might look different, depending on the HP POD 240e
Supported facility connections 19 Front view shown You must make the connections between the facility and the HP POD 240e NA. For configuration and
© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warrantie
Supported facility connections 20 The electrical layout of the fire alarm system is described in the schematic drawing that is supplied with the HP
Environmental considerations 21 Environmental considerations Environmental risks • Avoid placing the HP POD 240e NA directly along a drainage path
Site plan requirements and actions 22 Site plan requirements and actions Completing a site assessment HP requires a detailed assessment before plann
Site plan requirements and actions 23 • Interface directly with the HP installation project manager to be sure clear lines of communication exist d
Site plan requirements and actions 24 • General assembly equipment locations Lifting requirements WARNING: The only approved method for liftin
Appendix A: HP site assessment 25 Appendix A: HP site assessment HP POD 240e NA site assessment checklist During a survey of the readiness of a prop
Appendix A: HP site assessment 26 Item Description Yes No N/A Initial 11. Support infrastructure for access requirements Physically evaluate th
Appendix A: HP site assessment 27 Item Description Initial 8. Network infrastructure information Provide HP information regarding the planned netw
Appendix B: Preparing for delivery 28 Appendix B: Preparing for delivery Pre-delivery tasks Allow adequate time for planning, scheduling, obtaining
Appendix B: Preparing for delivery 29 Item Description Sign-off 7 Verify the average local temperatures and be sure that adequate environment prot
Contents 3 Contents Overview ...
Appendix B: Preparing for delivery 30 Item Description Sign-off 1 Verify that the HP POD 240e NA is not in a drainage path or flood prone area to
Contacting HP 31 Contacting HP Before you contact HP Be sure to have the following information available before you call HP: • Active Health System
Regulatory compliance notices 32 Regulatory compliance notices HP POD 240e NA regulatory compliance The HP POD 240e NA complies with the following r
Regulatory compliance notices 33 • The HP POD 240e NA is designed for stationary installation outdoors in a Pollution Degree 3 environment, in rest
Glossary 34 Glossary AHJ authority having jurisdiction AHU air handler unit APJ Asia Pacific Japan BMS building management system door A hinged
Glossary 35 labeled Equipment or materials to which has been attached a label, symbol, or other identifying mark of an organization that is acceptab
Glossary 36 UPS uninterruptible power system VESDA very early smoke detection apparatus
Index 37 Documentation feedback HP is committed to providing documentation that meets your needs. To help us improve the documentation, send any err
Index 38 A areas prone to lightning or power surges 21 assembly area 23 B before you contact HP 31 BSMI notice 33 C capacities 6 cold aisl
Index 39 T Turkey RoHS material content declaration 33 U Ukraine RoHS material content declaration 33 utilities 12 utilities, requirements 1
Contents 4 Installation prerequisites ...
Overview 5 Overview About this document This document outlines the site preparation requirements for an HP Performance Optimized Datacenter 240e NA.
Overview 6 • As part of the overall certification, relevant sections of the International Building Code have been applied as part of the design an
Site requirements 7 Site requirements Site pad The structural design of the HP POD 240e NA site pad must be based on the specific weight load of the
Site requirements 8 Every site must have sufficient clearance for assembly, maintenance, and service, including such handling devices as a forklift,
Site requirements 9 Side view clearances shown End view clearances shown For additional dimensions, see the HP Site Preparation Drawing Package (o