Strona 1 - North America (Adiabatic)

HP Performance Optimized Datacenter 240e North America (Adiabatic) Site Preparation and Requirements Guide Abstract This guide is intended for the

Strona 2

Site requirements 10 CAUTION: If any racks contain empty RU space, use the HP POD 240e NA filler panels to maintain the efficiency of the HP POD 2

Strona 3 - Contents

Site requirements 11 The following is a list of component requirements for grounding and bonding: • Grounding of the HP POD 240e NA must comply wit

Strona 4 - Contents 4

Site requirements 12 Utilities Consider the proximity to required utilities, such as power, water, and network connections. While the required utili

Strona 5 - Overview

Site requirements 13 • Do not use well water, industrial water, water from cooling circuits, or water contaminated by any chemicals or bacteria. •

Strona 6 - Capacities

Site requirements 14 IMPORTANT: To provide power to the HP POD 240e NA, external transformers and switchboards might be required. This equipment m

Strona 7 - Site requirements

Site requirements 15 Transformers and switchboards The input power for the Critical IT Loads requires a source of 380-415V, 3phase wye power. If it

Strona 8 - Site requirements 8

Supported facility connections 16 Supported facility connections Environmental control system The ECS developed for the HP EcoPOD is a stand-alone c

Strona 9 - Future expansions

Supported facility connections 17 End view shown Connection portal diameter Connection point Quantity per IT section Total quantity per HP POD 24

Strona 10 - Grounding requirements

Supported facility connections 18 IMPORTANT: The connection portal location and configuration might look different, depending on the HP POD 240e

Strona 11

Supported facility connections 19 Front view shown You must make the connections between the facility and the HP POD 240e NA. For configuration and

Strona 12 - Utilities

© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warrantie

Strona 13 - Drain locations

Supported facility connections 20 The electrical layout of the fire alarm system is described in the schematic drawing that is supplied with the HP

Strona 14 - Site electrical system

Environmental considerations 21 Environmental considerations Environmental risks • Avoid placing the HP POD 240e NA directly along a drainage path

Strona 15 - Site requirements 15

Site plan requirements and actions 22 Site plan requirements and actions Completing a site assessment HP requires a detailed assessment before plann

Strona 16 - Environmental control system

Site plan requirements and actions 23 • Interface directly with the HP installation project manager to be sure clear lines of communication exist d

Strona 17

Site plan requirements and actions 24 • General assembly equipment locations Lifting requirements WARNING: The only approved method for liftin

Strona 18 - Demarcation box

Appendix A: HP site assessment 25 Appendix A: HP site assessment HP POD 240e NA site assessment checklist During a survey of the readiness of a prop

Strona 19 - Access control

Appendix A: HP site assessment 26 Item Description Yes No N/A Initial 11. Support infrastructure for access requirements Physically evaluate th

Strona 20

Appendix A: HP site assessment 27 Item Description Initial 8. Network infrastructure information Provide HP information regarding the planned netw

Strona 21 - Environmental considerations

Appendix B: Preparing for delivery 28 Appendix B: Preparing for delivery Pre-delivery tasks Allow adequate time for planning, scheduling, obtaining

Strona 22 - Project coordination

Appendix B: Preparing for delivery 29 Item Description Sign-off 7 Verify the average local temperatures and be sure that adequate environment prot

Strona 23 - Site planning

Contents 3 Contents Overview ...

Strona 24 - Other structures

Appendix B: Preparing for delivery 30 Item Description Sign-off 1 Verify that the HP POD 240e NA is not in a drainage path or flood prone area to

Strona 25

Contacting HP 31 Contacting HP Before you contact HP Be sure to have the following information available before you call HP: • Active Health System

Strona 26

Regulatory compliance notices 32 Regulatory compliance notices HP POD 240e NA regulatory compliance The HP POD 240e NA complies with the following r

Strona 27 - Item Description Initial

Regulatory compliance notices 33 • The HP POD 240e NA is designed for stationary installation outdoors in a Pollution Degree 3 environment, in rest

Strona 28 - Pre-delivery tasks

Glossary 34 Glossary AHJ authority having jurisdiction AHU air handler unit APJ Asia Pacific Japan BMS building management system door A hinged

Strona 29

Glossary 35 labeled Equipment or materials to which has been attached a label, symbol, or other identifying mark of an organization that is acceptab

Strona 30

Glossary 36 UPS uninterruptible power system VESDA very early smoke detection apparatus

Strona 31 - Contacting HP

Index 37 Documentation feedback HP is committed to providing documentation that meets your needs. To help us improve the documentation, send any err

Strona 32 - Safety and NEC compliance

Index 38 A areas prone to lightning or power surges 21 assembly area 23 B before you contact HP 31 BSMI notice 33 C capacities 6 cold aisl

Strona 33 - Warranty information

Index 39 T Turkey RoHS material content declaration 33 U Ukraine RoHS material content declaration 33 utilities 12 utilities, requirements 1

Strona 34 - Glossary

Contents 4 Installation prerequisites ...

Strona 35 - Glossary 35

Overview 5 Overview About this document This document outlines the site preparation requirements for an HP Performance Optimized Datacenter 240e NA.

Strona 36 - Glossary 36

Overview 6 • As part of the overall certification, relevant sections of the International Building Code have been applied as part of the design an

Strona 37 - Documentation feedback

Site requirements 7 Site requirements Site pad The structural design of the HP POD 240e NA site pad must be based on the specific weight load of the

Strona 38 - Index 38

Site requirements 8 Every site must have sufficient clearance for assembly, maintenance, and service, including such handling devices as a forklift,

Strona 39 - Index 39

Site requirements 9 Side view clearances shown End view clearances shown For additional dimensions, see the HP Site Preparation Drawing Package (o