Hp ProLiant DL385 G7 Server Instrukcja Użytkownika Strona 35

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 34
Setup 35
Installing the server into the rack
CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the
rack. Install the heaviest item first, and continue to populate the rack from the bottom to the
top.
1. Install the server and cable management arm into the rack. For more information, see the installation
instructions that ship with the 2U Quick Deploy Rail System.
2. Connect peripheral devices to the server.
Item Description Color
1 PCI slot 5
2 PCI slot 6
3 PCI slot 4
4 PCI slot 2
5 PCI slot 3
6 PCI slot 1
7 Power supply 2
8 Power supply 2 connector
9 Power supply 1
10 Power supply 1 connector
11 USB connectors (2) Black
12 Video connector Blue
13 NIC 1 connector
14 NIC 2 connector
15 Mouse connector Green
16 Keyboard connector Purple
17 Serial connector
18 iLO 3 connector
19 NIC 3 connector
20 NIC 4 connector
Przeglądanie stron 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 110 111

Komentarze do niniejszej Instrukcji

Brak uwag