Hp ProLiant ML310e Gen8 Server Instrukcja Użytkownika Strona 51

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 50
Hardware options installation 51
10.
If installing a full-length expansion board, install back the board retainer.
11. Install the expansion slot cover retainer.
12. Connect all necessary internal and external cables to the expansion board. For more information on
these cabling requirements, see the documentation that ships with the option.
13. Install the air baffle (on page 22).
14. Install the access panel (on page 21).
15. Lock the tower bezel.
16. Connect each power cord to the server.
17. Connect each power cord to the power source.
18. Power up the server (on page 18).
Przeglądanie stron 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 106 107

Komentarze do niniejszej Instrukcji

Brak uwag