Hp ProLiant ML350e Gen8 v2-Server Instrukcja Użytkownika Strona 78

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 77
Hardware options installation 78
o
Eight-bay SFF cable routing to box 1
o Eight-bay + eight-bay SFF cable routing to boxes 1 and 2
13. Install the fan modules and the fan blank (on page 31).
14. Install any full-length PCI expansion cards that were removed ("Installing an expansion board" on page
63).
15. Install the system air baffle (on page 28).
16. If removed, install the PCI air baffle ("PCI air baffle option" on page 38).
17. Install the access panel (on page 26).
18. Return the server to an upright position.
19. Lock the front bezel (on page 24).
20. Connect each power cord to the server.
21. Connect each power cord to the power source.
22. Power up the server (on page 23).
Przeglądanie stron 77
1 2 ... 73 74 75 76 77 78 79 80 81 82 83 ... 128 129

Komentarze do niniejszej Instrukcji

Brak uwag