HP SuperStack 3 Load Balancer Appliance Instrukcja Użytkownika Strona 18

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 99
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 17
18 CHAPTER 2: INSTALLING THE SERVER LOAD BALANCER
Package Contents Your shipping container should contain the following items:
Server Load Balancer (3C11620)
or Server Load Balancer Plus (3C11621)
User Guide (this guide)
Power Cord
2 x mounting brackets
6 x screws
4 x rubber feet
Choosing a Suitable
Site
The Server Load Balancer is suited for use where it can be mounted in a
standard 19-inch equipment rack, or free-standing. A rack-mounting kit,
containing two mounting brackets and six screws is supplied with the
unit.
CAUTION: Ensure that the ventilation holes are not obstructed.
When deciding where to position the Server Load Balancer, ensure that:
Cabling is located away from sources of electrical noise such as radios,
transmitters and broadband amplifiers.
Cabling is located away from power lines and fluorescent lighting
fixtures
The Server Load Balancer is accessible and cables can be connected
easily.
Water or moisture cannot enter the case of the Server Load Balancer.
Air-flow is not restricted around the Server Load Balancer or through
the vents in the side of the Server Load Balancer. 3Com recommends
that you provide a minimum of 25 mm (1 in.) clearance.
The air is as free from dust as possible.
No more than four Server Load Balancer units are placed on top of
one another, if the units are free-standing.
Temperature operating limits are not exceeded. It is recommended
that the unit is installed in a clean, air conditioned environment.
Ensure there is adequate clearance at the front of the unit to ensure
that the fibers are not damaged as they have a restricted bend radius.
slb_gsg.bk Page 18 Thursday, May 31, 2001 8:57 AM
Przeglądanie stron 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 98 99

Komentarze do niniejszej Instrukcji

Brak uwag