Hp StorageWorks 2.32 Edge Switch Instrukcja Użytkownika Strona 80

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 79
Configuring SAN products and fabrics80
Before you display the route between two ports, ensure that:
All switches or directors in the route are managed by the HAFM application and attached to the
same appliance.
All switches or directors in the route are attached to the same appliance.
All switches or directors in the route are Director 2/64, Director 2/140, Edge Switch 2/32,
Edge Switch 2/16, or Edge Switch 2/24 models and are running firmware 1.3 or higher.
All attached products in the route are in the same zone.
To show the route for two ports:
1. In the Product List, click the plus (+) symbol next to the switch product icon you want to expand.
2. Right-click a node and select Show Route.
The Show Route dialog box appears (Figure 42).
Figure 42 Show Route dialog box
3. Select a destination port from the Destination Port list.
4. Click OK.
The route between the ports appears (Figure 43).
Figure 43 Displaying routes between ports
Przeglądanie stron 79
1 2 ... 75 76 77 78 79 80 81 82 83 84 85 ... 265 266

Komentarze do niniejszej Instrukcji

Brak uwag