Hp StorageWorks IP Storage Router Instrukcja Użytkownika Strona 30

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 29
Installation
30 IP Storage Router SR2122-2 User Guide
c. Measure the space between the inner edges of the left-front and
right-front mounting uprights to ensure that the space is 17.75 inches
(45.72 cm) wide.
2. Use the rack template provided to mark the center of a 1U mounting location
on both sides of the front and rear mounting uprights.
3. Install cage nuts in the locations marked in step 2.
Figure 7: Installing cage nuts
4. Assemble the rails using the supplied wing nuts (see Figure 8).
Note: Do not tighten the wing nuts completely because the rails will need to be
adjusted later in the installation process.
Przeglądanie stron 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 241 242

Komentarze do niniejszej Instrukcji

Brak uwag