Hp ProLiant BL680c G5 Server-Blade Instrukcja Użytkownika Strona 25

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 24
Hardware options installation 25
2.
Prepare the hard drive.
3. Install the hard drive.
4. Determine the status of the hard drive from the hot-plug hard drive LEDs ("SAS and SATA hard drive
LEDs" on page 8).
5. Resume normal server blade operations.
Processor option
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION: To avoid damage to the system board:
Do not touch the processor socket contacts.
Do not tilt or slide the processor when lowering the processor into the socket.
Przeglądanie stron 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 99 100

Komentarze do niniejszej Instrukcji

Brak uwag