Hp ProLiant SL210t Gen8 Server Instrukcja Użytkownika Strona 50

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 49
Hardware options installation 50
10.
Route the cable along the side of the server, and then connect the two cable ends to the corresponding
connectors on the adapter board.
11. Install the PCI riser cage (on page 21).
12. Install the 1U air baffle (on page 28).
13. Install the 1U cable guard (on page 19).
14. Install the node into the chassis ("Installing a node into the chassis" on page 30).
15. Connect all peripheral cables to the node.
16. Power up the node ("Power up the nodes" on page 17).
Installing the Mini-SAS P420 SFF cable in a 2U node
1. Power down the node (on page 17).
2. Disconnect all peripheral cables.
3. Remove the node from the chassis (on page 17).
4. Remove the PCI riser cage (on page 20).
5. Remove the 2U adapter board bracket (on page 22).
6. Disconnect and remove the Mini-SAS cable ("Remove the Mini-SAS cable" on page 23).
7. If not installed, install a P420 Smart Array controller into the PCI riser cage ("Installing an expansion
board" on page 42).
8. Connect the two Mini-SAS cable x4 connectors to the P420 Smart Array controller.
Przeglądanie stron 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 102 103

Komentarze do niniejszej Instrukcji

Brak uwag