Hp ProLiant XL220a Gen8 v2-Server Instrukcja Użytkownika Strona 18

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 17
Operations 18
2.
Install the PCI riser board assembly.
3. Connect all cables to existing expansion boards.
4. Install the server (on page 18).
5. Connect all peripheral cables to the server.
6. Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
Install the server
CAUTION: To prevent improper cooling and thermal damage, do not operate the chassis unless
all bays are populated with a component or a blank.
Przeglądanie stron 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 73 74

Komentarze do niniejszej Instrukcji

Brak uwag