Appendix A: Forms and checklists 83
Item Area/condition Yes No Comment/date
6
Is there a dedicated branch circuit for equipment?
7
Is there a dedicated branch circuit less than 22.86 m (75 ft) away?
8
Are the input circuit breakers sized to protect their respective
receptacles for equipment loads?
Safety considerations
Item Area/condition Yes No Comment/date
1
Is there an emergency power shutoff switch?
2
Is there a telephone available for emergency purposes?
3
Is there a fire protection system in the computer room?
4
Is antistatic flooring installed?
Cooling considerations
Item Area/condition Yes No Comment/date
1
Can the room temperature be maintained between the recommended
range of 20°C to 25°C (68°F to 77°F) and allowable range of 15°C
to 32°C (59°F to 90°F) (up to 5,000 ft)? Derate 1°C/1,000 ft above
5,000 ft and up to 10,000 ft.
2
Can the humidity level be maintained at the recommended level of
40% to 50%, with allowable humidity levels of 20% to 60%?
3
Are air conditioning filters installed and clean?
Water preparation considerations
Item Area/condition Yes No Comment/date
1
Has the water been tested for acceptable quality for use in the HP
Modular Cooling System 200/100?
2
If the water quality is unacceptable, have adequate treatment
filtration measures been put in place?
3
Have the water temperature and flow been evaluated?
4
Has piping of an appropriate diameter, material, and pressure
tolerance been installed to reach the back of each MCS-100 and
MCS-200/100?
5
Is there a provision for fluid collected from the condensation and
overflow hoses at each MCS-100 and MCS-200/100?
6
Is there dedicated cabinet space for storage of water quality
chemicals and gloves?
7
Is there an available space to prepare and handle chemicals before
adding them to the system?
8
Is Nalprep 8349 (commercially available from Nalco Company)
available on site for the secondary loop cleaning procedure?
9
Has the approximate volume of water in the entire system been
determined? (Necessary for water chemical preparation)
10
Have the water treatment chemicals been evaluated and approved
through your facility EHS department?