
Hardware options installation 41
7.
(Optional) When shipping a server with a full-height device installed, replace the front guide screw
with a shipping screw ("Installing the full-height media device shipping screw" on page 41).
8. Connect the data and power cables to the rear of the device.
9. Install the access panel (on page 19).
10. Do one of the following:
• Close or install the tower bezel, as needed.
• Slide the server back into the rack.
Installing the full-height media device shipping screw
When shipping a server with a full-height media device installed, always install a shipping screw to
secure the device.
1. Install the full-height media device ("Installing a half-height or full-height media device" on page 40).
2. Remove the front guide screw from the full-height media device, and the silver shipping screw from
the chassis.
Komentarze do niniejszej Instrukcji