
UPS installation 47
3.
Connect the appropriate external switch to terminal block 4, normally-open REPO. Connect Pin 1 to Pin
1 and connect Pin 2 to Pin 2 of each UPS.
IMPORTANT: Always test the REPO function before applying the critical load to avoid accidental
load loss. For more information, see "Verifying the REPO port connection (on page 71)."
Komentarze do niniejszej Instrukcji