
UPS installation 49
3.
Connect the appropriate external switch to terminal block 5, normally-closed REPO. Connect Pin 1 to
Pin 1 and connect Pin 2 to Pin 2 of each UPS, and then discard the jumper from terminal block 5.
IMPORTANT: Always test the REPO function before applying the critical load to avoid accidental
load loss. For more information, see "Verifying the REPO port connection (on page 71)."
Komentarze do niniejszej Instrukcji