
Hardware options installation 30
8.
Remove the applicable bezel blanks from the bezel.
9. Install the access panel (on page 17).
10. Install the bezel ("Unlock the tower bezel" on page 17).
11. Power up the server (on page 16).
USB tape drive
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays
are populated with either a component or a blank.
1. Power down the server (on page 16).
2. Remove the bezel ("Unlock the tower bezel" on page 17).
3. Remove the access panel (on page 17).
4. Remove the applicable media bay blank.
5. Install the tape drive.
6. Secure the USB tape drive cable to the USB tape drive cable connector on the system board
("System board components" on page 10).
7. Remove the applicable bezel blanks from the bezel.
8. Install the access panel (on page 17).
9. Install the bezel ("Unlock the tower bezel" on page 17).
10. Power up the server (on page 16).
Full-height tape drive
1. Power down the server (on page 16).
2. Remove the bezel ("Unlock the tower bezel" on page 17).
3. Remove the access panel (on page 17).
4. Remove the media bay blanks.
Komentarze do niniejszej Instrukcji