Hp Array Controller HSG V8.7 Software Instrukcja Użytkownika Strona 145

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 206
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 144
Power Distribution
UltraSCSI RAID Enclosure 6–19
3. Align the ac input box (C
ALLOUT
1) with either slot A or slot B in the
lower
left
or
lower
right corner
of the RAID enclosure, respectively.
4. Push in on the ac input box to fully seat it.
5. Tighten the two retaining screws (C
ALLOUT
2).
6. Connect the ac power cord (C
ALLOUT
4) from the ac power source to
the ac input box (C
ALLOUT
1).
7. If necessary, repeat steps 1 through 6 to install a second ac input box.
8. Turn O
N
each ac input box
by pressing the
I
on the ac
power switch (C
ALLOUT
1).
9. Verify that all power supply status LEDs turn O
N
.
Table 6–6 Installing an AC Input Box (Continued)
1
0
1
0
1
2
3
4
CXO5186B
1
0
CXO5488B
2
1
Przeglądanie stron 144
1 2 ... 140 141 142 143 144 145 146 147 148 149 150 ... 205 206

Komentarze do niniejszej Instrukcji

Brak uwag