Hp ProLiant DL120 G7 Server Instrukcja Użytkownika Strona 33

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 32
Hardware options installation 33
Installing a hot-plug drive
IMPORTANT: Hot-plug capability and drive LED support are only available when a supported
optional controller is installed in the server.
1. Power down the server (on page 17).
2. Remove the existing drive blank ("Removing a drive blank" on page 31).
3. Prepare the drive.
4. Install the drive.
Optical drive option
To install the component:
1. Power down the server (on page 17).
2. Remove the server from the rack (on page 17).
Przeglądanie stron 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 104 105

Komentarze do niniejszej Instrukcji

Brak uwag