Hp ProLiant DL120 G7 Server Instrukcja Użytkownika Strona 36

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 35
Hardware options installation 36
5.
Press the knockout.
6. To remove the knockout from the chassis, twist and pull it.
7. Using a T-15 Torx screwdriver, install the dedicated iLO management port module.
8. Install the air baffle (on page 20).
9. Install the access panel (on page 18).
10. Install the server into the rack ("Installing the server into the rack" on page 25).
11. Power up the server ("Powering up and configuring the server" on page 26, on page 17).
Expansion board option
To install the component:
1. Power down the server (on page 17).
2. Remove the server from the rack (on page 17).
Przeglądanie stron 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 104 105

Komentarze do niniejszej Instrukcji

Brak uwag