Hp ProLiant DL385p Gen8 Server Instrukcja Użytkownika Strona 66

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 65
Hardware options installation 66
12 drive LFF
25 drive SFF
1. Install the access panel (on page 25).
2. Install the server into the rack ("Installing the server into the rack" on page 40).
3. Connect each power cord to the server.
4. Connect each power cord to the power source.
5. Power up the server (on page 23).
Optical drive option
1. Power down the server (on page 23).
2. Remove all power:
a. Disconnect each power cord from the power source.
Przeglądanie stron 65
1 2 ... 61 62 63 64 65 66 67 68 69 70 71 ... 134 135

Komentarze do niniejszej Instrukcji

Brak uwag