Hp ProLiant ML110 G7 Server Instrukcja Użytkownika Strona 27

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 26
Setup 27
CAUTION: To avoid damage to the equipment, be sure that the rack rails are installed in a
predetermined location on the rack so that airflow clearance issues are resolved. For airflow
clearance information, refer to the documentation that ships with the server.
To install the component:
1. See the "Installing the Product into a Rack" section of the 2U Quick Deploy Rack Rail System Installation
Instructions to do the following:
a. Install the component rails on the tray.
b. Install the rack rails in the rack.
2. Install the tray onto the rack rails, and then partially slide the assembly into the rack.
3. Attach the straps to the tray.
4. Place the server on the tray, and then secure the server to the tray.
Przeglądanie stron 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 112 113

Komentarze do niniejszej Instrukcji

Brak uwag